Abstract
The importance of ethical considerations in the construction industry is acknowledged. This is particularly the case that the industry plays a significant part in a nation’s development. The Zambian construction industry has seen an increase in activity due, in part, to massive infrastructure development programs adopted by successive governments, increase in foreign direct investment and housing development. The Zambian construction industry, like any other, is not immune to unethical behaviour. This study investigated students’ perception of the prevalence of unethical practices in the Zambian construction industry. A review of literature demonstrated that a number of contextual factors including location can influence the perception of unethical practices. A focus on Zambia was therefore considered necessary. One hundred and twenty one students took part in a questionnaire survey to examine their perception of the extent to which unethical practices were prevalent in the Zambian construction industry. The findings suggest that students perceived bribery/corruption and political /societal influences as the two most common unethical practices, while the least prevalent unethical practices were perceived to be alcohol/drug abuse and workplace violence. The findings are largely consistent with previous studies investigating the ethical perception of professionals in the Zambian construction industry. In addition, the findings suggests that when year of study and program of study is taken into consideration, the differences in perception of unethical practices, is evident for these demographic groups. This study provided an added dimension to the understanding of ethical issues in the Zambian construction industry as it was the first of its kind involving students’ perceptions. This paper therefore contributes to the list of countries where similar studies have been undertaken.
More Information
Identification Number: | https://doi.org/10.1108/JEDT-04-2018-0074 |
---|---|
Status: | Published |
Refereed: | Yes |
Publisher: | Emerald |
Uncontrolled Keywords: | 09 Engineering, 12 Built Environment And Design, |
Depositing User (symplectic) | Deposited by Zulu, Sam |
Date Deposited: | 06 Nov 2018 12:16 |
Last Modified: | 10 Jul 2024 15:45 |
Item Type: | Article |
Download
Note: this is the author's final manuscript and may differ from the published version which should be used for citation purposes.
| Preview