Abstract
A significant proportion of construction projects are failing to achieve their deadline finish dates. This advocate for solutions that could address the root causes of time impacting risks, leading to the use of 4D BIM for project planning. This study investigates the impacts of 4D BIM on construction projects. An exploratory sequential mixed method research was conducted to initially explore the topic via interviews and literature review, and, subsequently, the themes derived were put into questionnaires to elicit expert knowledge on a wider industry scale. The data were analysed using thematic analysis, reliability analysis, Kruskal-Wallis test and factor analysis. Across the objectives around the impacts of 4D BIM on project reliability, monitoring and diagnosis, the findings presented eight key ways the 4D BIM support project performance. Examples of component factors that were raised was planning efficiency to enhance planner output, assessment and directive with a better comparison of planned and actual progress, and thorough/comprehensive risk reflection to cover wide ranges of issues. Upon further reflection, the finding highlighted the issues of the lack of shared responsibility outside of the planner and BIM coordinator, severe lack of understanding and training regarding 4D BIM and complexity of carrying out the process effectively.
More Information
Identification Number: | https://doi.org/10.1080/15623599.2019.1580832 |
---|---|
Status: | Published |
Refereed: | Yes |
Publisher: | Taylor & Francis |
Uncontrolled Keywords: | 0905 Civil Engineering, 1202 Building, |
Depositing User (symplectic) | Deposited by Ajayi, Saheed |
Date Deposited: | 07 Feb 2019 14:25 |
Last Modified: | 10 Jul 2024 17:37 |
Item Type: | Article |
Download
Note: this is the author's final manuscript and may differ from the published version which should be used for citation purposes.
| Preview
Export Citation
Explore Further
Read more research from the author(s):