Abstract
Purpose
Building information modelling (BIM) is an innovative, collaborative process underpinned by digital technologies introduced to improve project performance in the architecture, engineering and construction (AEC). Growth in industry demands has necessitated BIM inclusion into the higher education (HE) curricula as both a pedagogic and practical objective to prepare and develop aspiring built environment (BE) professionals with the required competence for contemporary practice. However, comprehension of BIM concepts and subsequent development of the skill set required for its application remains overwhelming for students. In mitigating this challenge, adopting appropriate learner-centred strategies has been advocated. Problem-based learning (PBL) is becoming a widespread strategy to address concerns associated with authentic practices.
Design/methodology/approach
This paper evaluates the impact of the PBL strategy on students' accelerated learning of BIM based on a case study of 53 undergraduate students in a BIM module. The network analysis and centrality measures were employed in understudying the most applicable BIM skills.
Findings
From the analyses, PBL benefits students' knowledge acquisition (cognitive and affective) of BIM concept and development of transferable skills (academic and disciplinary), equipping them with capabilities to become BIM competent and workplace ready for the AEC industry.
Originality/value
The BIM pedagogy evolves, and new skillsets emerge. Analytical, communications and collaboration skills remain sacrosanct to delivering BIM modules. These skills mentioned above are essential in getting undergraduate students ready to apply BIM in the AEC sector.
More Information
Identification Number: | https://doi.org/10.1108/sasbe-05-2022-0085 |
---|---|
Status: | Published |
Refereed: | Yes |
Publisher: | Emerald |
Additional Information: | This author accepted manuscript is deposited under a Creative Commons Attribution Non-commercial 4.0 International (CC BY-NC) licence. This means that anyone may distribute, adapt, and build upon the work for non-commercial purposes, subject to full attribution. If you wish to use this manuscript for commercial purposes, please contact permissions@emerald.com. |
Uncontrolled Keywords: | 12 Built Environment and Design, |
Depositing User (symplectic) | Deposited by Omotayo, Temitope |
Date Deposited: | 16 Sep 2022 07:53 |
Last Modified: | 10 Jul 2024 19:55 |
Item Type: | Article |
Download
Note: this is the author's final manuscript and may differ from the published version which should be used for citation purposes.
License: Creative Commons Attribution Non-commercial
| Preview
Export Citation
Explore Further
Read more research from the author(s):